EveBoosters

LINKING…
Blueprint #11972Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 3.12B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job134,511,670
Install fee25,139,669
Total cost, whole job159,651,339
Cost per unit159,651,339
Profit / unit
-18,604,889
Margin
-11.7%
Profit, whole job (1 unit)-18,604,889
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job116,443,872
Install fee25,139,669
Total cost, whole job141,583,541
Cost per unit141,583,541
Profit / unit
-537,091
Margin
-0.4%
Profit, whole job (1 unit)-537,091
Job install fee
Estimated Item Value (EIV)117,037,565.17
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 117,037,565.17 × 21.48%
Install fee, whole job25,139,669

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit146,200,000
Jita buy price, per unit138,100,000
Sales tax (2.02%)-2,960,550
Broker fee (1.50%)-2,193,000
Net revenue, per unit141,046,450
Net revenue, whole job (1 unit)141,046,450

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Celestis1110,200,0007,704,00010,200,0007,704,00012,019,655.9
Construction Blocks756810,2509,104697,000619,0724,563.06
Crystalline Carbonide Armor Plate3,7503,3756,4365,94221,721,50020,054,2505,674.42
Fusion Reactor Unit3027142,900132,3003,858,3003,572,10028,365.62
Ion Thruster605439,90035,9002,154,6001,938,60020,690.81
Magnetometric Sensor Cluster49544619,19016,3808,558,7407,305,48013,945.22
Morphite15013520,10018,8402,713,5002,543,40019,610.43
Oscillator Capacitor Unit37533834,90032,62011,796,20011,025,56034,114.6
Photon Microprocessor1,8001,62035,98033,10058,287,60053,622,00028,922.41
Pulse Shield Emitter30027053,75029,81014,512,5008,048,70021,989.67
R.A.M.- Starship Tech181769063011,73010,710528
Materials, whole job134,511,670116,443,872117,037,565.17

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 17.3 trades/day, 22 units/day.