EveBoosters

LINKING…
Blueprint #11990Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 4.88B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job125,347,490
Install fee24,029,968.72
Total cost, whole job149,377,458.72
Cost per unit149,377,458.72
Profit / unit
22,155,091.28
Margin
14.8%
Profit, whole job (1 unit)22,155,091.28
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job112,104,152
Install fee24,029,968.72
Total cost, whole job136,134,120.72
Cost per unit136,134,120.72
Profit / unit
35,398,429.28
Margin
26.0%
Profit, whole job (1 unit)35,398,429.28
Job install fee
Estimated Item Value (EIV)111,923,468.65
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 111,923,468.65 × 21.47%
Install fee, whole job24,029,968.72

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit177,800,000
Jita buy price, per unit164,400,000
Sales tax (2.02%)-3,600,450
Broker fee (1.50%)-2,667,000
Net revenue, per unit171,532,550
Net revenue, whole job (1 unit)171,532,550

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Construction Blocks75689,1059,104619,140619,0724,563.06
Crystalline Carbonide Armor Plate2,2502,0256,4365,94213,032,90012,032,5505,674.42
Exequror1110,790,0009,139,00010,790,0009,139,00010,225,956.52
Fusion Reactor Unit2321142,800132,3002,998,8002,778,30028,365.62
Ion Thruster756839,99035,9002,719,3202,441,20020,690.81
Magnetometric Sensor Cluster26323719,19016,3804,548,0303,882,06013,945.22
Morphite908120,11018,8801,628,9101,529,28019,610.43
Oscillator Capacitor Unit75067534,83032,63023,510,25022,025,25034,114.6
Photon Microprocessor1,8001,62035,95033,10058,239,00053,622,00028,922.41
Pulse Shield Emitter15013553,73029,8407,253,5504,028,40021,989.67
R.A.M.- Starship Tech12116906407,5907,040528
Materials, whole job125,347,490112,104,152111,923,468.65

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 18.1 trades/day, 32 units/day.