EveBoosters

LINKING…
Blueprint #12762Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 71.3M/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job1,984,420
Install fee507,070.75
Total cost, whole job2,491,490.75
Cost per unit498.3
Profit / unit
-163.72
Margin
-32.9%
Profit, whole job (5,000 units)-818,614.25
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job1,814,325
Install fee507,070.75
Total cost, whole job2,321,395.75
Cost per unit464.28
Profit / unit
-129.7
Margin
-27.9%
Profit, whole job (5,000 units)-648,519.25
Job install fee
Estimated Item Value (EIV)2,361,764.09
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 2,361,764.09 × 21.47%
Install fee, whole job507,070.75

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit346.8
Jita buy price, per unit271.8
Sales tax (2.02%)-7.02
Broker fee (1.50%)-5.2
Net revenue, per unit334.58
Net revenue, whole job (5,000 units)1,672,876.5

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 5,000
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Fernite Carbide6,0005,40074.9666.46404,784358,88471.01
Fullerides1,5001,350767.37001,035,855945,000897.89
Morphite302720,11018,880542,970509,76019,610.43
R.A.M.- Ammunition Tech11811681811681576.48
Materials, whole job1,984,4201,814,3252,361,764.09

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 24.1 trades/day, 210,392 units/day.