EveBoosters

LINKING…

Strong Frentix Booster

Market detail
Blueprint #25322Build system Jita 0.9 · The ForgeIndex 17.21%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 381.2M/day
Incomplete. These materials have no sell order we can price in The Forge: Pure Strong Frentix Booster. Every total that depends on them is withheld rather than computed as if they were free — read the blanks below as “unknown”, not as zero.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job
Install fee
Total cost, whole job
Cost per unit
Profit / unit
Margin
Profit, whole job (1 unit)
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job164,444
Install fee
Total cost, whole job
Cost per unit
Profit / unit
Margin
Profit, whole job (1 unit)
Job install fee
Estimated Item Value (EIV)
fee = EIV × ( index 17.21% + facility 0.25% + SCC 4% )
EIV is unknown: at least one material has no published adjusted price, and a partial EIV would understate the fee. No fee is shown rather than a low one.
Install fee, whole job

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit20,600,000
Jita buy price, per unit16,580,000
Sales tax (2.02%)-417,150
Broker fee (1.50%)-309,000
Net revenue, per unit19,873,850
Net revenue, whole job (1 unit)19,873,850

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Megacyte882,8252,81822,60022,5441,819.8
Pure Strong Frentix Boosterunpriced111014,190141,900
Materials, whole job164,444

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.21%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 5.3 trades/day, 21 units/day.