EveBoosters

LINKING…
Blueprint #20126Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 5.08B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job161,888,470
Install fee26,811,638.36
Total cost, whole job188,700,108.36
Cost per unit188,700,108.36
Profit / unit
-44,180,558.36
Margin
-23.4%
Profit, whole job (1 unit)-44,180,558.36
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job136,388,767
Install fee26,811,638.36
Total cost, whole job163,200,405.36
Cost per unit163,200,405.36
Profit / unit
-18,680,855.36
Margin
-11.4%
Profit, whole job (1 unit)-18,680,855.36
Job install fee
Estimated Item Value (EIV)124,821,407.62
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 124,821,407.62 × 21.48%
Install fee, whole job26,811,638.36

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit149,800,000
Jita buy price, per unit142,000,000
Sales tax (2.02%)-3,033,450
Broker fee (1.50%)-2,247,000
Net revenue, per unit144,519,550
Net revenue, whole job (1 unit)144,519,550

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Antimatter Reactor Unit3027141,900118,6003,831,3003,202,20044,443.61
Arbitrator1110,360,0009,001,00010,360,0009,001,0008,944,668.45
Construction Blocks756810,2509,104697,000619,0724,563.06
Fusion Thruster605431,20028,7801,684,8001,554,12010,548.13
Linear Shield Emitter30027039,36029,29010,627,2007,908,30016,283.85
Morphite15013520,10018,8402,713,5002,543,40019,610.43
Nanoelectrical Microprocessor1,8001,62051,48042,66083,397,60069,109,20031,545.86
Radar Sensor Cluster49544620,76017,0409,258,9607,599,84014,393.98
R.A.M.- Starship Tech181769063011,73010,710528
Tesseract Capacitor Unit37533849,51042,10016,734,38014,229,80039,636.01
Tungsten Carbide Armor Plate3,7503,3756,6886,10722,572,00020,611,1257,189.6
Materials, whole job161,888,470136,388,767124,821,407.62

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 28.5 trades/day, 33 units/day.