Charon
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Auto-Integrity Preservation Seal | 400 | 360 | 48,660 | 45,100 | 17,517,600 | 16,236,000 | 8,583.01 |
| Capital Armor Plates | 5 | 5 | 17,650,000 | 15,150,000 | 88,250,000 | 75,750,000 | 7,562,886.21 |
| Capital Cargo Bay | 50 | 45 | 15,200,000 | 13,730,000 | 684,000,000 | 617,850,000 | 14,764,233.3 |
| Capital Construction Parts | 5 | 5 | 9,186,000 | 8,421,000 | 45,930,000 | 42,105,000 | 11,323,984.26 |
| Capital Core Temperature Regulator | 1 | 1 | 194,500,000 | 185,000,000 | 194,500,000 | 185,000,000 | 201,825,323.34 |
| Capital Propulsion Engine | 5 | 5 | 13,300,000 | 10,730,000 | 66,500,000 | 53,650,000 | 13,818,010.19 |
| Gravimetric-FTL Interlink Communicator | 1 | 1 | 98,690,000 | 92,890,000 | 98,690,000 | 92,890,000 | 12,960,751.41 |
| Life Support Backup Unit | 200 | 180 | 81,080 | 79,000 | 14,594,400 | 14,220,000 | 9,578.12 |
| R-O Trigger Neurolink Conduit | 16 | 15 | 24,200,000 | 22,320,000 | 363,000,000 | 334,800,000 | 404,009.25 |
| Materials, whole job | 1,572,982,000 | 1,432,501,000 | 1,128,335,118.45 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.21%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 13.6 trades/day, 14 units/day.