EveBoosters

LINKING…

Deprecated Ore Prospecting Array 4

Market detail
Blueprint #34858Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d /day
Illiquid. Deprecated Ore Prospecting Array 4 no trade history yet; no daily volume yet. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job161,870,000
Install fee25,361,173.48
Total cost, whole job187,231,173.48
Cost per unit187,231,173.48
Profit / unit
167,025,026.52
Margin
89.2%
Profit, whole job (1 unit)167,025,026.52
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job151,716,200
Install fee25,361,173.48
Total cost, whole job177,077,373.48
Cost per unit177,077,373.48
Profit / unit
177,178,826.52
Margin
100.1%
Profit, whole job (1 unit)177,178,826.52
Job install fee
Estimated Item Value (EIV)118,123,770.27
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 118,123,770.27 × 21.47%
Install fee, whole job25,361,173.48

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit367,200,000
Jita buy price, per unit65,000,000
Sales tax (2.02%)-7,435,800
Broker fee (1.50%)-5,508,000
Net revenue, per unit354,256,200
Net revenue, whole job (1 unit)354,256,200

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Broadcast Node1091,922,0001,863,00017,298,00016,767,0001,104,977.57
Capital Construction Parts449,186,0008,421,00036,744,00033,684,00011,323,984.26
Integrity Response Drones882,310,0002,179,00018,480,00017,432,0001,131,935.28
Nano-Factory13121,103,0001,071,00013,236,00012,852,000469,094.3
Organic Mortar Applicators13121,096,000998,60013,152,00011,983,200480,335.99
Recursive Computing Module1091,500,0001,443,00013,500,00012,987,000910,308.96
Self-Harmonizing Power Core1092,000,0001,935,00018,000,00017,415,0001,044,405.54
Sterile Conduits13121,255,0001,159,00015,060,00013,908,0001,111,675.42
Wetware Mainframe882,050,0001,836,00016,400,00014,688,000797,632.02
Materials, whole job161,870,000151,716,200118,123,770.27

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: trades/day, units/day.