EveBoosters

LINKING…

Deprecated Survey Networks 3

Market detail
Blueprint #34862Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d /day
Illiquid. Deprecated Survey Networks 3 no trade history yet; no daily volume yet; buy and sell prices are too far apart to be a real spread. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job181,108,000
Install fee27,788,166.94
Total cost, whole job208,896,166.94
Cost per unit208,896,166.94
Profit / unit
25,538,083.06
Margin
12.2%
Profit, whole job (1 unit)25,538,083.06
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job169,871,600
Install fee27,788,166.94
Total cost, whole job197,659,766.94
Cost per unit197,659,766.94
Profit / unit
36,774,483.06
Margin
18.6%
Profit, whole job (1 unit)36,774,483.06
Job install fee
Estimated Item Value (EIV)129,427,885.15
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 129,427,885.15 × 21.47%
Install fee, whole job27,788,166.94

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit243,000,000
Jita buy price, per unit51,000
Sales tax (2.02%)-4,920,750
Broker fee (1.50%)-3,645,000
Net revenue, per unit234,434,250
Net revenue, whole job (1 unit)234,434,250

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Broadcast Node11101,922,0001,863,00019,220,00018,630,0001,104,977.57
Capital Construction Parts449,186,0008,421,00036,744,00033,684,00011,323,984.26
Integrity Response Drones882,310,0002,179,00018,480,00017,432,0001,131,935.28
Nano-Factory17161,103,0001,071,00017,648,00017,136,000469,094.3
Organic Mortar Applicators17161,096,000998,60017,536,00015,977,600480,335.99
Recursive Computing Module11101,500,0001,443,00015,000,00014,430,000910,308.96
Self-Harmonizing Power Core11102,000,0001,935,00020,000,00019,350,0001,044,405.54
Sterile Conduits17161,255,0001,159,00020,080,00018,544,0001,111,675.42
Wetware Mainframe882,050,0001,836,00016,400,00014,688,000797,632.02
Materials, whole job181,108,000169,871,600129,427,885.15

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: trades/day, units/day.