EveBoosters

LINKING…

1MN Analog Booster Afterburner

Market detail
Blueprint #21471Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 301.5M/day
Illiquid. 1MN Analog Booster Afterburner trades under 5 times a day; under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job10,957,022.57
Install fee759,439.02
Total cost, whole job11,716,461.59
Cost per unit11,716,461.59
Profit / unit
87,942,213.41
Margin
750.6%
Profit, whole job (1 unit)87,942,213.41
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job5,498,182.79
Install fee759,439.02
Total cost, whole job6,257,621.81
Cost per unit6,257,621.81
Profit / unit
93,401,053.19
Margin
1492.6%
Profit, whole job (1 unit)93,401,053.19
Job install fee
Estimated Item Value (EIV)3,535,563.4
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 3,535,563.4 × 21.48%
Install fee, whole job759,439.02

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit103,300,000
Jita buy price, per unit81,010,000
Sales tax (2.02%)-2,091,825
Broker fee (1.50%)-1,549,500
Net revenue, per unit99,658,675
Net revenue, whole job (1 unit)99,658,675

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Mexallon1154.6752.3154.6752.3138.42
Nocxium11751.9735751.9735621.25
Pyerite64357918.4417.110,676.769,900.911.81
Sleeper Foundation Block114,471,0002,283,0004,471,0002,283,0003,264,256.95
Sleeper Heat Nullifying Coil113,479,0002,973,0003,479,0002,973,00072,003.73
Sleeper Micro Circuits112,993,000229,0002,993,000229,000188,823.89
Tritanium7086383.983.912,539.242,494.583.14
Materials, whole job10,957,022.575,498,182.793,535,563.4

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 1.8 trades/day, 2 units/day.