Medium 'Integrative' Hull Repair Unit
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Megacyte | 18 | 17 | 2,825 | 2,817 | 48,025 | 47,889 | 1,819.8 |
| Pyerite | 6,993 | 6,294 | 18.42 | 17.1 | 115,935.48 | 107,627.4 | 11.81 |
| Sleeper Data Crystals | 1 | 1 | 225,500 | 100,500 | 225,500 | 100,500 | 61,797.31 |
| Sleeper Foundation Block | 2 | 2 | 4,471,000 | 2,283,000 | 8,942,000 | 4,566,000 | 3,264,256.95 |
| Sleeper Manuscripts | 1 | 1 | 4,082,000 | 1,976,000 | 4,082,000 | 1,976,000 | 952,742.73 |
| Sleeper Nanite Cluster | 2 | 2 | 2,900,000 | 2,698,000 | 5,800,000 | 5,396,000 | 300,152.53 |
| Sleeper Reintegration Control | 1 | 1 | 1,345,000 | 611,200 | 1,345,000 | 611,200 | 465,334.6 |
| Sleeper Split Cables | 1 | 1 | 499,500 | 20,600 | 499,500 | 20,600 | 40,175.93 |
| Sleeper Technical Schematics | 1 | 1 | 1,250,000 | 624,700 | 1,250,000 | 624,700 | 17,833.4 |
| Tritanium | 511 | 460 | 3.97 | 3.87 | 1,826.2 | 1,780.2 | 3.14 |
| Zydrine | 8 | 8 | 1,309 | 1,308 | 10,472 | 10,464 | 1,401.2 |
| Materials, whole job | 22,320,258.68 | 13,462,760.6 | 8,794,891.02 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 1.3 trades/day, 1 units/day.