'Delineative' Warp Scrambler
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Isogen | 197 | 178 | 198.7 | 185.8 | 35,368.6 | 33,072.4 | 194.75 |
| Mexallon | 334 | 301 | 54.67 | 52.31 | 16,455.67 | 15,745.31 | 38.42 |
| Pyerite | 297 | 268 | 18.44 | 17.1 | 4,941.92 | 4,582.8 | 11.81 |
| Sleeper Cryo Batteries | 1 | 1 | 147,800,000 | 148,700 | 147,800,000 | 148,700 | 107,966.21 |
| Sleeper Data Interface Protocol | 1 | 1 | 699,900 | 50,570 | 699,900 | 50,570 | 28,922.74 |
| Sleeper Foundation Block | 1 | 1 | 4,471,000 | 2,283,000 | 4,471,000 | 2,283,000 | 3,264,256.95 |
| Sleeper Manuscripts | 1 | 1 | 4,082,000 | 1,972,000 | 4,082,000 | 1,972,000 | 952,742.73 |
| Sleeper Nanite Cluster | 2 | 2 | 2,900,000 | 2,698,000 | 5,800,000 | 5,396,000 | 300,152.53 |
| Sleeper Reintegration Control | 1 | 1 | 1,345,000 | 611,200 | 1,345,000 | 611,200 | 465,334.6 |
| Sleeper Split Cables | 1 | 1 | 499,500 | 20,600 | 499,500 | 20,600 | 40,175.93 |
| Sleeper Virtual Energizer | 2 | 2 | 1,244,000 | 401,900 | 2,488,000 | 803,800 | 346,632.63 |
| Tritanium | 502 | 452 | 3.98 | 3.91 | 1,798.96 | 1,767.32 | 3.14 |
| Zydrine | 4 | 4 | 1,346 | 1,307 | 5,384 | 5,228 | 1,401.2 |
| Materials, whole job | 167,249,349.15 | 11,346,265.83 | 6,214,856.4 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 5.8 trades/day, 7 units/day.