'Regressive' Large Proton Smartbomb
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Mexallon | 16 | 15 | 54.67 | 52.33 | 820.05 | 784.95 | 38.42 |
| Nocxium | 1 | 1 | 751.9 | 735 | 751.9 | 735 | 621.25 |
| Pyerite | 30,339 | 27,306 | 18.42 | 17.1 | 502,976.52 | 466,932.6 | 11.81 |
| Sleeper Cryo Batteries | 1 | 1 | 147,800,000 | 148,700 | 147,800,000 | 148,700 | 107,966.21 |
| Sleeper Foundation Block | 2 | 2 | 4,471,000 | 2,283,000 | 8,942,000 | 4,566,000 | 3,264,256.95 |
| Sleeper Heat Nullifying Coil | 2 | 2 | 3,479,000 | 2,973,000 | 6,958,000 | 5,946,000 | 72,003.73 |
| Sleeper Hyperbooster | 1 | 1 | 1,386,000 | 522,500 | 1,386,000 | 522,500 | 513,265.1 |
| Sleeper Micro Circuits | 2 | 2 | 2,993,000 | 229,000 | 5,986,000 | 458,000 | 188,823.89 |
| Sleeper Reintegration Control | 2 | 2 | 1,345,000 | 611,200 | 2,690,000 | 1,222,400 | 465,334.6 |
| Sleeper Thermal Regulator | 2 | 2 | 10,440,000 | 9,310,000 | 20,880,000 | 18,620,000 | 222,801.48 |
| Sleeper Virtual Energizer | 2 | 2 | 1,244,000 | 401,900 | 2,488,000 | 803,800 | 346,632.63 |
| Tritanium | 37,951 | 34,156 | 3.97 | 3.87 | 135,599.32 | 132,183.72 | 3.14 |
| Zydrine | 14 | 13 | 1,309 | 1,308 | 17,017 | 17,004 | 1,401.2 |
| Materials, whole job | 197,787,164.79 | 32,905,040.27 | 10,239,361.02 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 2.7 trades/day, 4 units/day.