EveBoosters

LINKING…

Hammerhead II

Market detail
Blueprint #2186Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 2.91B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job598,290
Install fee56,477.9
Total cost, whole job654,767.9
Cost per unit654,767.9
Profit / unit
200,386.5
Margin
30.6%
Profit, whole job (1 unit)200,386.5
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job560,424.2
Install fee56,477.9
Total cost, whole job616,902.1
Cost per unit616,902.1
Profit / unit
238,252.3
Margin
38.6%
Profit, whole job (1 unit)238,252.3
Job install fee
Estimated Item Value (EIV)263,054.95
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 263,054.95 × 21.47%
Install fee, whole job56,477.9

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit886,400
Jita buy price, per unit781,000
Sales tax (2.02%)-17,949.6
Broker fee (1.50%)-13,296
Net revenue, per unit855,154.4
Net revenue, whole job (1 unit)855,154.4

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Guidance Systems3375,95072,550227,850217,65018,669.07
Hammerhead I1121,82017,66021,82017,66017,957.31
Morphite3320,11018,88060,33056,64019,610.43
Particle Accelerator Unit1123,98017,26023,98017,26022,250.54
R.A.M.- Robotics11700534.2700534.2597.38
Robotics3387,87083,560263,610250,68035,803.74
Materials, whole job598,290560,424.2263,054.95

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 371.9 trades/day, 3,445 units/day.