EveBoosters

LINKING…
Blueprint #22437Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 26.32B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job792,736,060
Install fee148,993,813
Total cost, whole job941,729,873
Cost per unit941,729,873
Profit / unit
16,459,827
Margin
1.7%
Profit, whole job (1 unit)16,459,827
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job688,933,160
Install fee148,993,813
Total cost, whole job837,926,973
Cost per unit837,926,973
Profit / unit
120,262,727
Margin
14.4%
Profit, whole job (1 unit)120,262,727
Job install fee
Estimated Item Value (EIV)693,962,799.27
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 693,962,799.27 × 21.47%
Install fee, whole job148,993,813

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit993,200,000
Jita buy price, per unit916,100,000
Sales tax (2.02%)-20,112,300
Broker fee (1.50%)-14,898,000
Net revenue, per unit958,189,700
Net revenue, whole job (1 unit)958,189,700

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Capital Jump Drive3318,500,00015,730,00055,500,00047,190,00013,358,196.01
Construction Blocks4504059,1059,1043,687,5253,687,1204,563.06
Gravimetric Sensor Cluster90081020,40018,20016,524,00014,742,00018,551.56
Graviton Reactor Unit450405148,500124,40060,142,50050,382,00027,501.74
Magpulse Thruster22520329,51023,0605,990,5304,681,18015,535.33
Morphite90081020,11018,88016,289,10015,292,80019,610.43
Quantum Microprocessor6,3005,67044,83039,060254,186,100221,470,20031,547.85
R.A.M.- Starship Tech302769064018,63017,280528
Scalar Capacitor Unit2,2502,02549,97041,420101,189,25083,875,50046,396.25
Scorpion11119,000,000108,600,000119,000,000108,600,000138,254,777.97
Sustained Shield Emitter1,6341,47138,05030,73055,971,55045,203,83019,474.45
Titanium Diborite Armor Plate18,75016,8756,1775,558104,236,87593,791,2506,847.09
Materials, whole job792,736,060688,933,160693,962,799.27

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 26.5 trades/day, 29 units/day.