EveBoosters

LINKING…
Blueprint #22441Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 7.89B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job859,609,775
Install fee125,495,402.26
Total cost, whole job985,105,177.26
Cost per unit985,105,177.26
Profit / unit
-194,010,177.26
Margin
-19.7%
Profit, whole job (1 unit)-194,010,177.26
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job710,902,285
Install fee125,495,402.26
Total cost, whole job836,397,687.26
Cost per unit836,397,687.26
Profit / unit
-45,302,687.26
Margin
-5.4%
Profit, whole job (1 unit)-45,302,687.26
Job install fee
Estimated Item Value (EIV)584,243,027.3
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 584,243,027.3 × 21.48%
Install fee, whole job125,495,402.26

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit820,000,000
Jita buy price, per unit751,800,000
Sales tax (2.02%)-16,605,000
Broker fee (1.50%)-12,300,000
Net revenue, per unit791,095,000
Net revenue, whole job (1 unit)791,095,000

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Capital Jump Drive3318,500,00015,730,00055,500,00047,190,00013,358,196.01
Construction Blocks45040510,2509,1044,151,2503,687,1204,563.06
Deflection Shield Emitter1,6341,47132,83025,44048,292,93037,422,24014,603.15
Electrolytic Capacitor Unit2,2502,02567,54045,000136,768,50091,125,00042,836.55
Fernite Carbide Composite Armor Plate18,75016,8755,9994,953101,233,12583,581,8755,670.21
Ladar Sensor Cluster90081022,00016,19017,820,00013,113,90014,739.49
Morphite90081020,10018,84016,281,00015,260,40019,610.43
Nanomechanical Microprocessor6,3005,67043,47039,310246,474,900222,887,70027,888.69
Nuclear Reactor Unit450405162,900106,40065,974,50043,092,00022,512.49
Plasma Thruster22520332,98029,6806,694,9406,025,04018,186.52
R.A.M.- Starship Tech302769063018,63017,010528
Typhoon11160,400,000147,500,000160,400,000147,500,00094,702,743.29
Materials, whole job859,609,775710,902,285584,243,027.3

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 10.1 trades/day, 10 units/day.