EveBoosters

LINKING…

Absolution

Market detail
Blueprint #22449Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 5.12B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job299,216,565
Install fee54,262,675.29
Total cost, whole job353,479,240.29
Cost per unit353,479,240.29
Profit / unit
30,780,684.71
Margin
8.7%
Profit, whole job (1 unit)30,780,684.71
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job255,631,430
Install fee54,262,675.29
Total cost, whole job309,894,105.29
Cost per unit309,894,105.29
Profit / unit
74,365,819.71
Margin
24.0%
Profit, whole job (1 unit)74,365,819.71
Job install fee
Estimated Item Value (EIV)252,737,192.76
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 252,737,192.76 × 21.47%
Install fee, whole job54,262,675.29

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit398,300,000
Jita buy price, per unit296,400,000
Sales tax (2.02%)-8,065,575
Broker fee (1.50%)-5,974,500
Net revenue, per unit384,259,925
Net revenue, whole job (1 unit)384,259,925

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Antimatter Reactor Unit6054141,800118,6007,657,2006,404,40044,443.61
Construction Blocks3002709,1059,1042,458,3502,458,0804,563.06
Fusion Thruster12010831,20028,7803,369,6003,108,24010,548.13
Harbinger1155,260,00048,690,00055,260,00048,690,00049,470,826.2
Linear Shield Emitter57051343,00029,29022,059,00015,025,77016,283.85
Morphite30027020,11018,8805,429,7005,097,60019,610.43
Nanoelectrical Microprocessor1,8001,62051,48042,67083,397,60069,125,40031,545.86
Radar Sensor Cluster45040520,75017,0408,403,7506,901,20014,393.98
R.A.M.- Starship Tech232169064014,49013,440528
Tesseract Capacitor Unit97587849,50042,10043,461,00036,963,80039,636.01
Tungsten Carbide Armor Plate11,25010,1256,6876,10867,705,87561,843,5007,189.6
Materials, whole job299,216,565255,631,430252,737,192.76

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 11.6 trades/day, 16 units/day.