EveBoosters

LINKING…
Blueprint #22549Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 23.17B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job203,017,145
Install fee33,709,083.87
Total cost, whole job236,726,228.87
Cost per unit236,726,228.87
Profit / unit
-41,557,303.87
Margin
-17.6%
Profit, whole job (1 unit)-41,557,303.87
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job180,906,280
Install fee33,709,083.87
Total cost, whole job214,615,363.87
Cost per unit214,615,363.87
Profit / unit
-19,446,438.87
Margin
-9.1%
Profit, whole job (1 unit)-19,446,438.87
Job install fee
Estimated Item Value (EIV)157,005,514.06
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 157,005,514.06 × 21.47%
Install fee, whole job33,709,083.87

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit202,300,000
Jita buy price, per unit189,500,000
Sales tax (2.02%)-4,096,575
Broker fee (1.50%)-3,034,500
Net revenue, per unit195,168,925
Net revenue, whole job (1 unit)195,168,925

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Construction Blocks1501359,1059,1041,229,1751,229,0404,563.06
Crystalline Carbonide Armor Plate3,0002,7006,4365,94217,377,20016,043,4005,674.42
Fusion Reactor Unit4541142,800132,3005,854,8005,424,30028,365.62
Ion Thruster605439,99035,9002,159,4601,938,60020,690.81
Magnetometric Sensor Cluster22520319,19016,3803,895,5703,325,14013,945.22
Morphite1109920,11018,8801,990,8901,869,12019,610.43
Oscillator Capacitor Unit60054034,83032,63018,808,20017,620,20034,114.6
Photon Microprocessor3,0002,70035,95033,10097,065,00089,370,00028,922.41
Pulse Shield Emitter22520353,73029,84010,907,1906,057,52021,989.67
R.A.M.- Starship Tech15146906409,6608,960528
Retriever1143,720,00038,020,00043,720,00038,020,00019,293,468.43
Materials, whole job203,017,145180,906,280157,005,514.06

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 66 trades/day, 111 units/day.