EveBoosters

LINKING…

'Marketeer' Tracking Computer

Market detail
Blueprint #22930Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 169.2M/day
Illiquid. 'Marketeer' Tracking Computer trades under 5 times a day; under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job66,689,806.07
Install fee6,070,215.77
Total cost, whole job72,760,021.84
Cost per unit72,760,021.84
Profit / unit
-21,628,271.84
Margin
-29.7%
Profit, whole job (1 unit)-21,628,271.84
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job23,481,299.94
Install fee6,070,215.77
Total cost, whole job29,551,515.71
Cost per unit29,551,515.71
Profit / unit
21,580,234.29
Margin
73.0%
Profit, whole job (1 unit)21,580,234.29
Job install fee
Estimated Item Value (EIV)28,259,849.97
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 28,259,849.97 × 21.48%
Install fee, whole job6,070,215.77

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit53,000,000
Jita buy price, per unit34,750,000
Sales tax (2.02%)-1,073,250
Broker fee (1.50%)-795,000
Net revenue, per unit51,131,750
Net revenue, whole job (1 unit)51,131,750

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Internal Bulkhead22306.9104.6613.8209.2103.96
Mainframe Bit1191.3691.3591.3691.35567.13
Megacyte222,8252,8175,6505,6341,819.8
Second-hand Parts2228.2828.2756.5656.5421.27
Serpentis 3D Scanner Gamut2218,830,0008,517,00037,660,00017,034,0006,432,155.99
Serpentis Basic Target Guider2214,510,0003,219,00029,020,0006,438,0007,694,050.89
Tritanium9498553.973.873,394.353,308.853.14
Materials, whole job66,689,806.0723,481,299.9428,259,849.97

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 3.2 trades/day, 4 units/day.