Archon
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Auto-Integrity Preservation Seal | 400 | 360 | 48,660 | 45,100 | 17,517,600 | 16,236,000 | 8,583.01 |
| Capital Armor Plates | 6 | 6 | 17,650,000 | 15,190,000 | 105,900,000 | 91,140,000 | 7,562,886.21 |
| Capital Capacitor Battery | 3 | 3 | 13,940,000 | 12,560,000 | 41,820,000 | 37,680,000 | 8,263,022.41 |
| Capital Computer System | 3 | 3 | 13,550,000 | 11,880,000 | 40,650,000 | 35,640,000 | 7,823,927.57 |
| Capital Construction Parts | 4 | 4 | 9,186,000 | 8,421,000 | 36,744,000 | 33,684,000 | 11,323,984.26 |
| Capital Core Temperature Regulator | 1 | 1 | 194,500,000 | 185,000,000 | 194,500,000 | 185,000,000 | 201,825,323.34 |
| Capital Corporate Hangar Bay | 3 | 3 | 18,290,000 | 12,890,000 | 54,870,000 | 38,670,000 | 13,378,211.63 |
| Capital Drone Bay | 12 | 11 | 7,817,000 | 5,658,000 | 85,987,000 | 62,238,000 | 7,882,346.58 |
| Capital Jump Drive | 4 | 4 | 18,500,000 | 15,730,000 | 74,000,000 | 62,920,000 | 13,358,196.01 |
| Capital Power Generator | 3 | 3 | 18,150,000 | 15,110,000 | 54,450,000 | 45,330,000 | 17,362,543.19 |
| Capital Propulsion Engine | 4 | 4 | 13,300,000 | 10,730,000 | 53,200,000 | 42,920,000 | 13,818,010.19 |
| Capital Sensor Cluster | 4 | 4 | 12,200,000 | 10,300,000 | 48,800,000 | 41,200,000 | 12,326,197.23 |
| Capital Shield Emitter | 3 | 3 | 16,730,000 | 13,140,000 | 50,190,000 | 39,420,000 | 9,171,499.82 |
| Capital Ship Maintenance Bay | 6 | 6 | 17,730,000 | 15,620,000 | 106,380,000 | 93,720,000 | 16,885,324.71 |
| Life Support Backup Unit | 200 | 180 | 81,070 | 79,000 | 14,592,600 | 14,220,000 | 9,578.12 |
| Neurolink Protection Cell | 1 | 1 | 773,300,000 | 722,700,000 | 773,300,000 | 722,700,000 | 708,849,180.07 |
| Radar-FTL Interlink Communicator | 1 | 1 | 108,000,000 | 88,380,000 | 108,000,000 | 88,380,000 | 8,977,760.54 |
| U-C Trigger Neurolink Conduit | 12 | 11 | 17,900,000 | 16,120,000 | 196,900,000 | 177,320,000 | 401,877.64 |
| Materials, whole job | 2,057,801,200 | 1,828,418,000 | 1,542,404,212.24 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: — trades/day, — units/day.