EveBoosters

LINKING…

'Hauberk' Large Armor Repairer I

Market detail
Blueprint #23800Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 125.1M/day
Illiquid. 'Hauberk' Large Armor Repairer I trades under 5 times a day; under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job25,880,347.51
Install fee3,119,502.13
Total cost, whole job28,999,849.64
Cost per unit28,999,849.64
Profit / unit
8,239,500.36
Margin
28.4%
Profit, whole job (1 unit)8,239,500.36
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job17,442,404.97
Install fee3,119,502.13
Total cost, whole job20,561,907.1
Cost per unit20,561,907.1
Profit / unit
16,677,442.9
Margin
81.1%
Profit, whole job (1 unit)16,677,442.9
Job install fee
Estimated Item Value (EIV)14,522,821.86
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 14,522,821.86 × 21.48%
Install fee, whole job3,119,502.13

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit38,600,000
Jita buy price, per unit28,010,000
Sales tax (2.02%)-781,650
Broker fee (1.50%)-579,000
Net revenue, per unit37,239,350
Net revenue, whole job (1 unit)37,239,350

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Isogen4440198.61867,9447,440194.75
Mexallon1,02792554.6752.3350,569.7548,405.2538.42
Nocxium5146751.973534,587.433,810621.25
Pyerite1,8571,67218.4217.130,798.2428,591.211.81
Takmahl Astral Treatment1112,950,00010,030,00012,950,00010,030,000505,231.55
Takmahl Centrifugal Primer33194,900101,400584,700304,20050,754.99
Takmahl Gyro Ballast1150,91041,05050,91041,05061,263.47
Takmahl Phrenic Appendix22247,200140,800494,400281,600175,161.38
Takmahl Quantum Sphere1110,990,0006,575,00010,990,0006,575,00013,249,691.27
Takmahl Solid Mox22314,90032,560629,80065,12039,660.41
Takmahl Tri-polished Lens1139,98010,95039,98010,9508,446.11
Tritanium4,6624,1963.973.8716,658.1216,238.523.14
Materials, whole job25,880,347.5117,442,404.9714,522,821.86

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 2.2 trades/day, 3 units/day.