'Thurifer' Large Cap Battery
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Mexallon | 1,307 | 1,177 | 54.67 | 52.33 | 64,346.59 | 61,592.41 | 38.42 |
| Pyerite | 1,734 | 1,561 | 18.42 | 17.1 | 28,753.62 | 26,693.1 | 11.81 |
| Takmahl Biodroid Controller | 2 | 2 | 310,000 | 215,500 | 620,000 | 431,000 | 193,019.7 |
| Takmahl Cohere Cord | 1 | 1 | 21,500 | 21,490 | 21,500 | 21,490 | 74,089.98 |
| Takmahl Dynamic Gauge | 4 | 4 | 31,390,000 | 26,690,000 | 125,560,000 | 106,760,000 | 17,123,528.41 |
| Takmahl Fractal Sheet | 2 | 2 | 5,000,000 | 1,587,000 | 10,000,000 | 3,174,000 | 79,355.9 |
| Takmahl Geometric Design | 1 | 1 | 250,000 | 121,300 | 250,000 | 121,300 | 26,542.68 |
| Takmahl Magnetic Slab | 2 | 2 | 30,000 | 2.21 | 60,000 | 4.42 | 37,471.23 |
| Takmahl Phrenic Appendix | 1 | 1 | 247,200 | 140,800 | 247,200 | 140,800 | 175,161.38 |
| Tritanium | 4,574 | 4,117 | 3.97 | 3.87 | 16,344.49 | 15,932.79 | 3.14 |
| Zydrine | 4 | 4 | 1,309 | 1,308 | 5,236 | 5,232 | 1,401.2 |
| Materials, whole job | 136,873,380.7 | 110,758,044.72 | 69,480,261.75 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 8.4 trades/day, 10 units/day.