EveBoosters

LINKING…

'Mace' Dual Light Beam Laser I

Market detail
Blueprint #23835Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 15.0M/day
Illiquid. 'Mace' Dual Light Beam Laser I trades under 5 times a day; under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job185,671.41
Install fee18,259.29
Total cost, whole job203,930.7
Cost per unit203,930.7
Profit / unit
6,105,534.3
Margin
2993.9%
Profit, whole job (1 unit)6,105,534.3
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job75,937.33
Install fee18,259.29
Total cost, whole job94,196.62
Cost per unit94,196.62
Profit / unit
6,215,268.38
Margin
6598.2%
Profit, whole job (1 unit)6,215,268.38
Job install fee
Estimated Item Value (EIV)85,006.02
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 85,006.02 × 21.48%
Install fee, whole job18,259.29

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit6,540,000
Jita buy price, per unit844,700
Sales tax (2.02%)-132,435
Broker fee (1.50%)-98,100
Net revenue, per unit6,309,465
Net revenue, whole job (1 unit)6,309,465

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Blood Raider Limited Ballistic Control11170,40061,150170,40061,15071,069
Isogen1312198.61862,383.22,232194.75
Mexallon787154.6752.333,881.573,715.4338.42
Positron Cord2226.5826.5753.1653.1433.53
Pyerite6618.4217.1110.52102.611.81
Tritanium1,7421,5683.973.876,224.966,068.163.14
Zydrine221,3091,3082,6182,6161,401.2
Materials, whole job185,671.4175,937.3385,006.02

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 1.4 trades/day, 3 units/day.