Aeon
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Auto-Integrity Preservation Seal | 800 | 720 | 48,660 | 45,100 | 35,035,200 | 32,472,000 | 8,583.01 |
| Capital Armor Plates | 125 | 113 | 17,650,000 | 15,190,000 | 1,994,450,000 | 1,716,470,000 | 7,562,886.21 |
| Capital Capacitor Battery | 100 | 90 | 13,940,000 | 12,560,000 | 1,254,600,000 | 1,130,400,000 | 8,263,022.41 |
| Capital Computer System | 10 | 9 | 13,550,000 | 11,880,000 | 121,950,000 | 106,920,000 | 7,823,927.57 |
| Capital Construction Parts | 50 | 45 | 9,186,000 | 8,421,000 | 413,370,000 | 378,945,000 | 11,323,984.26 |
| Capital Core Temperature Regulator | 10 | 9 | 194,500,000 | 185,000,000 | 1,750,500,000 | 1,665,000,000 | 201,825,323.34 |
| Capital Corporate Hangar Bay | 50 | 45 | 18,290,000 | 12,890,000 | 823,050,000 | 580,050,000 | 13,378,211.63 |
| Capital Drone Bay | 250 | 225 | 7,817,000 | 5,658,000 | 1,758,825,000 | 1,273,050,000 | 7,882,346.58 |
| Capital Jump Drive | 100 | 90 | 18,500,000 | 15,730,000 | 1,665,000,000 | 1,415,700,000 | 13,358,196.01 |
| Capital Power Generator | 100 | 90 | 18,150,000 | 15,110,000 | 1,633,500,000 | 1,359,900,000 | 17,362,543.19 |
| Capital Propulsion Engine | 50 | 45 | 13,300,000 | 10,730,000 | 598,500,000 | 482,850,000 | 13,818,010.19 |
| Capital Sensor Cluster | 40 | 36 | 12,200,000 | 10,300,000 | 439,200,000 | 370,800,000 | 12,326,197.23 |
| Capital Shield Emitter | 25 | 23 | 16,730,000 | 13,140,000 | 384,790,000 | 302,220,000 | 9,171,499.82 |
| Capital Ship Maintenance Bay | 100 | 90 | 17,730,000 | 15,620,000 | 1,595,700,000 | 1,405,800,000 | 16,885,324.71 |
| Enhanced Neurolink Protection Cell | 1 | 1 | 22,770,000,000 | 18,000,000,000 | 22,770,000,000 | 18,000,000,000 | 639,090,499.9 |
| Life Support Backup Unit | 400 | 360 | 81,070 | 79,000 | 29,185,200 | 28,440,000 | 9,578.12 |
| Radar-FTL Interlink Communicator | 125 | 113 | 108,000,000 | 88,370,000 | 12,204,000,000 | 9,985,810,000 | 8,977,760.54 |
| U-C Trigger Neurolink Conduit | 64 | 58 | 17,900,000 | 16,120,000 | 1,038,200,000 | 934,960,000 | 401,877.64 |
| Materials, whole job | 50,509,855,400 | 41,169,787,000 | 15,045,422,642.61 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: — trades/day, — units/day.