EveBoosters

LINKING…

Nova Rage Rocket

Market detail
Blueprint #24474Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 96.7M/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job133,238.86
Install fee16,118.21
Total cost, whole job149,357.07
Cost per unit29.87
Profit / unit
64.48
Margin
215.9%
Profit, whole job (5,000 units)322,405.68
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job114,013.36
Install fee16,118.21
Total cost, whole job130,131.57
Cost per unit26.03
Profit / unit
68.33
Margin
262.5%
Profit, whole job (5,000 units)341,631.18
Job install fee
Estimated Item Value (EIV)75,073.16
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 75,073.16 × 21.47%
Install fee, whole job16,118.21

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit97.8
Jita buy price, per unit55.25
Sales tax (2.02%)-1.98
Broker fee (1.50%)-1.47
Net revenue, per unit94.35
Net revenue, whole job (5,000 units)471,762.75

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 5,000
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Fernite Carbide454174.9666.463,073.362,724.8671.01
Morphite1120,11018,88020,11018,88019,610.43
Nuclear Pulse Generator1123,74016,40023,74016,40020,267.01
Phenolic Composites55816.9761.54,084.53,807.5991.1
R.A.M.- Ammunition Tech11811681811681576.48
Rocket Fuel6613,57011,92081,42071,5204,411.41
Materials, whole job133,238.86114,013.3675,073.16

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 115.7 trades/day, 1,263,978 units/day.