EveBoosters

LINKING…

'Integrated' Hammerhead

Market detail
Blueprint #28271Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 79.3M/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job626,825
Install fee5,960.6
Total cost, whole job632,785.6
Cost per unit632,785.6
Profit / unit
-104,681.45
Margin
-16.5%
Profit, whole job (1 unit)-104,681.45
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job570,060
Install fee5,960.6
Total cost, whole job576,020.6
Cost per unit576,020.6
Profit / unit
-47,916.45
Margin
-8.3%
Profit, whole job (1 unit)-47,916.45
Job install fee
Estimated Item Value (EIV)27,762.45
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 27,762.45 × 21.47%
Install fee, whole job5,960.6

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit547,400
Jita buy price, per unit420,000
Sales tax (2.02%)-11,084.85
Broker fee (1.50%)-8,211
Net revenue, per unit528,104.15
Net revenue, whole job (1 unit)528,104.15

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Drone Capillary Fluid229,3019,30018,60218,600983.9
Drone Cerebral Fragment22286,800260,500573,600521,0001,865.57
Drone Synaptic Relay Wiring222,0012,0004,0024,0001,750.05
Drone Tactical Limb118,8018,8008,8018,800606.11
Hammerhead I1121,82017,66021,82017,66017,957.31
Materials, whole job626,825570,06027,762.45

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 28 trades/day, 160 units/day.