EveBoosters

LINKING…

Batch Compressed Spodumain III-Grade

Market detail
Blueprint #28489Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 163.5M/day
Incomplete. These materials have no sell order we can price in The Forge: Spodumain III-Grade. Every total that depends on them is withheld rather than computed as if they were free — read the blanks below as “unknown”, not as zero.
Illiquid. Batch Compressed Spodumain III-Grade trades under 5 times a day; buy and sell prices are too far apart to be a real spread. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job
Install fee250,538.01
Total cost, whole job
Cost per unit
Profit / unit
Margin
Profit, whole job (1 unit)
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job5,850,000
Install fee250,538.01
Total cost, whole job6,100,538.01
Cost per unit6,100,538.01
Profit / unit
-1,373,263.01
Margin
-22.5%
Profit, whole job (1 unit)-1,373,263.01
Job install fee
Estimated Item Value (EIV)1,166,921.33
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 1,166,921.33 × 21.47%
Install fee, whole job250,538.01

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit4,900,000
Jita buy price, per unit17,980
Sales tax (2.02%)-99,225
Broker fee (1.50%)-73,500
Net revenue, per unit4,727,275
Net revenue, whole job (1 unit)4,727,275

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Spodumain III-Gradeunpriced1,2501,1255,2005,850,000933.54
Materials, whole job5,850,0001,166,921.33

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 1.5 trades/day, 290 units/day.