Loki
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Electromechanical Interface Nexus | 8 | 8 | 974,700 | 452,200 | 7,797,600 | 3,617,600 | 299,582.67 |
| Emergent Neurovisual Interface | 2 | 2 | 27,960,000 | 17,510,000 | 55,920,000 | 35,020,000 | 29,449,196.6 |
| Fullerene Intercalated Sheets | 8 | 8 | 13,100,000 | 12,000,000 | 104,800,000 | 96,000,000 | 19,223,437.73 |
| Fulleroferrocene Power Conduits | 3 | 3 | 2,544,000 | 2,100,000 | 7,632,000 | 6,300,000 | 1,102,291.86 |
| Metallofullerene Plating | 16 | 15 | 189,900 | 70,110 | 2,848,500 | 1,051,650 | 100,470.55 |
| Nanowire Composites | 21 | 19 | 33,680 | 25,200 | 639,920 | 478,800 | 32,498.82 |
| Neurovisual Output Analyzer | 2 | 2 | 11,240,000 | 8,142,000 | 22,480,000 | 16,284,000 | 8,628,637.25 |
| R.A.M.- Starship Tech | 15 | 14 | 690 | 630 | 9,660 | 8,820 | 528 |
| Superconducting Ladar Amplifier | 12 | 11 | 1,753,000 | 702,400 | 19,283,000 | 7,726,400 | — |
| Materials, whole job | 221,410,680 | 166,487,270 | — | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 114.3 trades/day, 146 units/day.