EveBoosters

LINKING…

Fulleroferrocene Power Conduits

Market detail
Blueprint #30477Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 210.0M/day
Illiquid. Fulleroferrocene Power Conduits trades under 5 times a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job2,298,664.4
Install fee361,111.85
Total cost, whole job2,659,776.25
Cost per unit2,659,776.25
Profit / unit
-205,452.25
Margin
-7.7%
Profit, whole job (1 unit)-205,452.25
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job2,170,550.1
Install fee361,111.85
Total cost, whole job2,531,661.95
Cost per unit2,531,661.95
Profit / unit
-77,337.95
Margin
-3.1%
Profit, whole job (1 unit)-77,337.95
Job install fee
Estimated Item Value (EIV)1,681,936.87
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 1,681,936.87 × 21.47%
Install fee, whole job361,111.85

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit2,544,000
Jita buy price, per unit2,100,000
Sales tax (2.02%)-51,516
Broker fee (1.50%)-38,160
Net revenue, per unit2,454,324
Net revenue, whole job (1 unit)2,454,324

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Electromechanical Hull Sheeting66686.9577.94,121.43,467.441.09
Fulleroferrocene28261,3891,34536,11434,9701,152.34
Methanofullerene605411,38010,500614,520567,00010,155.75
Modified Fluid Router44678554.12,7122,216.4665.25
Neurovisual Input Matrix44218,800209,300875,200837,20053.59
Powdered C-540 Graphite33999882.12,9972,646.3542.41
PPD Fullerene Fibers11109,1008,30591,00083,0508,053.81
Scandium Metallofullerene444016,80016,000672,000640,00021,522.39
Materials, whole job2,298,664.42,170,550.11,681,936.87

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 4.3 trades/day, 86 units/day.