EveBoosters

LINKING…

Capital Liquid Cooled Electronics II

Market detail
Blueprint #31237Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d /day
Illiquid. Capital Liquid Cooled Electronics II no trade history yet; no daily volume yet; buy and sell prices are too far apart to be a real spread. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job39,474,073.8
Install fee9,904,432.2
Total cost, whole job49,378,506
Cost per unit49,378,506
Profit / unit
-23,330,256
Margin
-47.2%
Profit, whole job (1 unit)-23,330,256
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job38,020,767.7
Install fee9,904,432.2
Total cost, whole job47,925,199.9
Cost per unit47,925,199.9
Profit / unit
-21,876,949.9
Margin
-45.6%
Profit, whole job (1 unit)-21,876,949.9
Job install fee
Estimated Item Value (EIV)46,110,019.53
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 46,110,019.53 × 21.48%
Install fee, whole job9,904,432.2

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit27,000,000
Jita buy price, per unit25,100
Sales tax (2.02%)-546,750
Broker fee (1.50%)-405,000
Net revenue, per unit26,048,250
Net revenue, whole job (1 unit)26,048,250

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Artificial Neural Network1201081,1171,016120,636109,7281,050.3
Conductive Thermoplastic60546,2566,047337,824326,5388,231.7
Power Circuit150135289,000278,40039,015,00037,584,000303,263.46
R.A.M.- Electronics11613.8501.7613.8501.7562.82
Materials, whole job39,474,073.838,020,767.746,110,019.53

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: trades/day, units/day.