EveBoosters

LINKING…

Capital Core Defense Capacitor Safeguard II

Market detail
Blueprint #31775Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 765.9M/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job12,481,595
Install fee2,604,506.66
Total cost, whole job15,086,101.66
Cost per unit15,086,101.66
Profit / unit
10,016,693.34
Margin
66.4%
Profit, whole job (1 unit)10,016,693.34
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job12,270,579.3
Install fee2,604,506.66
Total cost, whole job14,875,085.96
Cost per unit14,875,085.96
Profit / unit
10,227,709.04
Margin
68.8%
Profit, whole job (1 unit)10,227,709.04
Job install fee
Estimated Item Value (EIV)12,125,263.76
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 12,125,263.76 × 21.48%
Install fee, whole job2,604,506.66

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit26,020,000
Jita buy price, per unit16,200,000
Sales tax (2.02%)-526,905
Broker fee (1.50%)-390,300
Net revenue, per unit25,102,795
Net revenue, whole job (1 unit)25,102,795

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Intact Shield Emitter3027375,300375,20010,133,10010,130,400341,920.51
Interface Circuit908124,49021,9201,983,6901,775,52016,386.38
Micro Circuit75685,3575,356364,276364,2085,230.5
R.A.M.- Shield Tech11529451.3529451.3587.08
Materials, whole job12,481,59512,270,579.312,125,263.76

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 12.2 trades/day, 26 units/day.