EveBoosters

LINKING…
Blueprint #32208Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d /day
Nothing is listed for sale in Jita, so there is no exit price and no profit figure — only the cost of building it.
Illiquid. Freki no trade history yet; no daily volume yet; nothing listed for sale. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job13,597,421.78
Install fee1,268,495.39
Total cost, whole job14,865,917.17
Cost per unit14,865,917.17
Profit / unit
Margin
Profit, whole job (1 unit)
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job10,002,459.04
Install fee1,268,495.39
Total cost, whole job11,270,954.43
Cost per unit11,270,954.43
Profit / unit
Margin
Profit, whole job (1 unit)
Job install fee
Estimated Item Value (EIV)5,908,222.58
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 5,908,222.58 × 21.47%
Install fee, whole job1,268,495.39

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit
Jita buy price, per unit220,100,000
Sales tax (2.02%)
Broker fee (1.50%)
Net revenue, per unit
Net revenue, whole job (1 unit)

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Construction Blocks28269,1059,104236,730236,7044,563.06
Deflection Shield Emitter444032,82025,4401,312,8001,017,60014,603.15
Electrolytic Capacitor Unit333067,51045,0002,025,3001,350,00042,836.55
Fernite Carbide Composite Armor Plate44405,9984,957239,920198,2805,670.21
Ladar Sensor Cluster222022,00016,190440,000323,80014,739.49
Megacyte12112,8252,81831,07530,9981,819.8
Mexallon2,4112,17054.6652.24118,612.2113,360.838.42
Morphite333020,11018,880603,300566,40019,610.43
Nanomechanical Microprocessor222043,45039,320869,000786,40027,888.69
Nocxium22750.9734.81,501.81,469.6621.25
Nuclear Reactor Unit4440162,600106,8006,504,0004,272,00022,512.49
Plasma Thruster333032,97029,690989,100890,70018,186.52
Pyerite6,8426,15818.4117.08113,368.78105,178.6411.81
Tritanium27,33324,6003.983.8797,90895,2023.14
Zydrine12111,3461,30614,80614,3661,401.2
Materials, whole job13,597,421.7810,002,459.045,908,222.58

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: trades/day, units/day.