Capital Drone Control Range Augmentor II
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Drone Transceiver | 60 | 54 | 55,000 | 53,000 | 2,970,000 | 2,862,000 | 21,974.08 |
| Logic Circuit | 113 | 102 | 2,427,000 | 2,384,000 | 247,554,000 | 243,168,000 | 162,531.17 |
| Power Circuit | 98 | 89 | 289,000 | 278,400 | 25,721,000 | 24,777,600 | 303,263.46 |
| R.A.M.- Robotics | 1 | 1 | 699.9 | 534.2 | 699.9 | 534.2 | 597.38 |
| Materials, whole job | 276,245,699.9 | 270,808,134.2 | 49,404,883.53 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 1.3 trades/day, 2 units/day.