EveBoosters

LINKING…

Capital Drone Durability Enhancer I

Market detail
Blueprint #33282Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 131.1M/day
Illiquid. Capital Drone Durability Enhancer I trades under 5 times a day; under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job24,990,073
Install fee2,623,037.86
Total cost, whole job27,613,110.86
Cost per unit27,613,110.86
Profit / unit
10,976,889.14
Margin
39.8%
Profit, whole job (1 unit)10,976,889.14
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job24,913,762
Install fee2,623,037.86
Total cost, whole job27,536,799.86
Cost per unit27,536,799.86
Profit / unit
11,053,200.14
Margin
40.1%
Profit, whole job (1 unit)11,053,200.14
Job install fee
Estimated Item Value (EIV)12,211,535.66
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 12,211,535.66 × 21.48%
Install fee, whole job2,623,037.86

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit40,000,000
Jita buy price, per unit30,000,000
Sales tax (2.02%)-810,000
Broker fee (1.50%)-600,000
Net revenue, per unit38,590,000
Net revenue, whole job (1 unit)38,590,000

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Broken Drone Transceiver4444002,8902,7131,156,0001,085,20073.8
Burned Logic Circuit55650144,56044,55022,324,56022,319,55019,367.54
Tripped Power Circuit5565013,0133,0121,509,5131,509,0122,536.72
Materials, whole job24,990,07324,913,76212,211,535.66

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 2.3 trades/day, 3 units/day.