Gecko
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Drone Capillary Fluid | 14 | 13 | 9,301 | 9,300 | 120,913 | 120,900 | 983.9 |
| Drone Cerebral Fragment | 10 | 9 | 286,900 | 260,600 | 2,582,100 | 2,345,400 | 1,865.57 |
| Drone Coronary Unit | 3 | 3 | 29,010 | 29,000 | 87,030 | 87,000 | 2,183.73 |
| Drone Epidermal Shielding Chunk | 6 | 6 | 2,700 | 2,699 | 16,200 | 16,194 | 384.32 |
| Drone Synaptic Relay Wiring | 16 | 15 | 2,001 | 2,000 | 30,015 | 30,000 | 1,750.05 |
| Drone Tactical Limb | 9 | 9 | 8,801 | 8,800 | 79,209 | 79,200 | 606.11 |
| Elite Drone AI | 2 | 2 | 2,601,000 | 2,600,000 | 5,202,000 | 5,200,000 | 901.71 |
| Guidance Systems | 18 | 17 | 75,950 | 72,550 | 1,291,150 | 1,233,350 | 18,669.07 |
| Isogen | 105 | 95 | 198.5 | 185 | 18,857.5 | 17,575 | 194.75 |
| Korako's Modified Drone Control Unit | 10 | 9 | 6,988,000 | 655,100 | 62,892,000 | 5,895,900 | — |
| Megacyte | 10 | 9 | 2,824 | 2,817 | 25,416 | 25,353 | 1,819.8 |
| Morphite | 18 | 17 | 20,110 | 18,860 | 341,870 | 320,620 | 19,610.43 |
| Nocxium | 55 | 50 | 750.9 | 734.4 | 37,545 | 36,720 | 621.25 |
| Particle Accelerator Unit | 5 | 5 | 23,000 | 17,230 | 115,000 | 86,150 | 22,250.54 |
| Pyerite | 6,420 | 5,778 | 18.4 | 17.08 | 106,315.2 | 98,688.24 | 11.81 |
| R.A.M.- Robotics | 1 | 1 | 700 | 534.2 | 700 | 534.2 | 597.38 |
| Robotics | 18 | 17 | 87,870 | 83,520 | 1,493,790 | 1,419,840 | 35,803.74 |
| Superconductor Rails | 5 | 5 | 20,170 | 16,460 | 100,850 | 82,300 | 23,028.19 |
| Tritanium | 12,150 | 10,935 | 3.96 | 3.87 | 43,302.6 | 42,318.45 | 3.14 |
| Zydrine | 36 | 33 | 1,346 | 1,306 | 44,418 | 43,098 | 1,401.2 |
| Materials, whole job | 74,628,681.3 | 17,181,140.89 | — | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 35.9 trades/day, 64 units/day.