EveBoosters

LINKING…

Entosis Link II

Market detail
Blueprint #34596Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 2.10B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job150,634,073.8
Install fee23,134,304.73
Total cost, whole job173,768,378.53
Cost per unit173,768,378.53
Profit / unit
23,715,946.47
Margin
13.6%
Profit, whole job (1 unit)23,715,946.47
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job128,737,541.7
Install fee23,134,304.73
Total cost, whole job151,871,846.43
Cost per unit151,871,846.43
Profit / unit
45,612,478.57
Margin
30.0%
Profit, whole job (1 unit)45,612,478.57
Job install fee
Estimated Item Value (EIV)107,701,604.91
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 107,701,604.91 × 21.48%
Install fee, whole job23,134,304.73

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit204,700,000
Jita buy price, per unit139,400,000
Sales tax (2.02%)-4,145,175
Broker fee (1.50%)-3,070,500
Net revenue, per unit197,484,325
Net revenue, whole job (1 unit)197,484,325

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Antimatter Reactor Unit7063141,700118,7008,927,1007,478,10044,443.61
Electrolytic Capacitor Unit807267,51045,0004,860,7203,240,00042,836.55
Entosis Link I1134,930,00027,590,00034,930,00027,590,00019,782,559.62
Fusion Reactor Unit7063142,800132,3008,996,4008,334,90028,365.62
Graviton Reactor Unit7063148,300124,6009,342,9007,849,80027,501.74
High-Tech Transmitters403681,00079,6202,916,0002,866,32042,308.52
Morphite3,0002,70020,09018,58054,243,00050,166,00019,610.43
Nuclear Reactor Unit7063162,400107,10010,231,2006,747,30022,512.49
Oscillator Capacitor Unit16014434,83032,6305,015,5204,698,72034,114.6
R.A.M.- Electronics11613.8501.7613.8501.7562.82
Scalar Capacitor Unit1009049,95041,4304,495,5003,728,70046,396.25
Synthetic Synapses201890,05088,0501,620,9001,584,90061,911.76
Tesseract Capacitor Unit807249,48042,1003,562,5603,031,20039,636.01
Transcranial Microcontrollers201882,87078,9501,491,6601,421,10043,160.67
Materials, whole job150,634,073.8128,737,541.7107,701,604.91

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 6.8 trades/day, 12 units/day.