Hecate
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Electromechanical Interface Nexus | 2 | 2 | 974,700 | 452,200 | 1,949,400 | 904,400 | 299,582.67 |
| Fullerene Intercalated Sheets | 2 | 2 | 13,100,000 | 12,000,000 | 26,200,000 | 24,000,000 | 19,223,437.73 |
| Fulleroferrocene Power Conduits | 2 | 2 | 2,544,000 | 2,100,000 | 5,088,000 | 4,200,000 | 1,102,291.86 |
| Metallofullerene Plating | 8 | 8 | 189,900 | 70,110 | 1,519,200 | 560,880 | 100,470.55 |
| Optimized Nano-Engines | 2 | 2 | 498,300 | 230,000 | 996,600 | 460,000 | 447,056.7 |
| R.A.M.- Starship Tech | 10 | 9 | 690 | 630 | 6,210 | 5,670 | 528 |
| Reconfigured Subspace Calibrator | 2 | 2 | 503,900 | 360,000 | 1,007,800 | 720,000 | 509,203.23 |
| Self-Assembling Nanolattice | 3 | 3 | 7,135,000 | 5,503,000 | 21,405,000 | 16,509,000 | 7,964,551.85 |
| Warfare Computation Core | 2 | 2 | 825,900 | 750,000 | 1,651,800 | 1,500,000 | 728,012.75 |
| Materials, whole job | 59,824,010 | 48,859,950 | 69,321,869.78 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 61.1 trades/day, 92 units/day.