EveBoosters

LINKING…
Blueprint #36966Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 8.88B/day
Illiquid. Astrahus under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job864,250,000
Install fee166,695,783.37
Total cost, whole job1,030,945,783.37
Cost per unit1,030,945,783.37
Profit / unit
-104,785,783.37
Margin
-10.2%
Profit, whole job (1 unit)-104,785,783.37
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job555,570,000
Install fee166,695,783.37
Total cost, whole job722,265,783.37
Cost per unit722,265,783.37
Profit / unit
203,894,216.63
Margin
28.2%
Profit, whole job (1 unit)203,894,216.63
Job install fee
Estimated Item Value (EIV)776,412,591.4
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 776,412,591.4 × 21.47%
Install fee, whole job166,695,783.37

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit960,000,000
Jita buy price, per unit871,600,000
Sales tax (2.02%)-19,440,000
Broker fee (1.50%)-14,400,000
Net revenue, per unit926,160,000
Net revenue, whole job (1 unit)926,160,000

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Structure Construction Parts1144,980,00030,290,00044,980,00030,290,00018,435,545.63
Structure Docking Bay1154,800,00032,330,00054,800,00032,330,0006,581,971.55
Structure Hangar Array1153,950,00030,300,00053,950,00030,300,00058,885,251.83
Structure Market Network44121,100,00087,240,000484,400,000348,960,000124,643,665.27
Structure Medical Center1158,860,00020,310,00058,860,00020,310,00047,305,967.83
Structure Office Center1154,370,00030,330,00054,370,00030,330,00048,242,473.1
Structure Repair Facility1157,890,00030,300,00057,890,00030,300,00053,612,045.46
Structure Storage Bay1155,000,00032,750,00055,000,00032,750,00044,774,674.93
Materials, whole job864,250,000555,570,000776,412,591.4

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 8.7 trades/day, 10 units/day.