Tatara
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Structure Acceleration Coils | 6 | 6 | 148,900,000 | 76,500,000 | 893,400,000 | 459,000,000 | 122,073,807.37 |
| Structure Advertisement Nexus | 2 | 2 | 124,000,000 | 34,470,000 | 248,000,000 | 68,940,000 | 77,833,694.72 |
| Structure Construction Parts | 8 | 8 | 44,980,000 | 30,290,000 | 359,840,000 | 242,320,000 | 18,435,545.63 |
| Structure Docking Bay | 4 | 4 | 54,800,000 | 32,330,000 | 219,200,000 | 129,320,000 | 6,581,971.55 |
| Structure Electromagnetic Sensor | 6 | 6 | 182,500,000 | 81,700,000 | 1,095,000,000 | 490,200,000 | 43,887,759.76 |
| Structure Factory | 2 | 2 | 143,500,000 | 25,140,000 | 287,000,000 | 50,280,000 | 85,164,444.5 |
| Structure Hangar Array | 4 | 4 | 53,950,000 | 30,300,000 | 215,800,000 | 121,200,000 | 58,885,251.83 |
| Structure Laboratory | 2 | 2 | 174,900,000 | 52,080,000 | 349,800,000 | 104,160,000 | 53,140,005.58 |
| Structure Market Network | 4 | 4 | 121,100,000 | 87,240,000 | 484,400,000 | 348,960,000 | 124,643,665.27 |
| Structure Medical Center | 2 | 2 | 58,860,000 | 20,310,000 | 117,720,000 | 40,620,000 | 47,305,967.83 |
| Structure Office Center | 4 | 4 | 54,370,000 | 30,330,000 | 217,480,000 | 121,320,000 | 48,242,473.1 |
| Structure Repair Facility | 4 | 4 | 57,890,000 | 30,300,000 | 231,560,000 | 121,200,000 | 53,612,045.46 |
| Structure Reprocessing Plant | 24 | 22 | 73,970,000 | 57,380,000 | 1,627,340,000 | 1,262,360,000 | 64,528,485.33 |
| Structure Storage Bay | 20 | 18 | 55,000,000 | 32,750,000 | 990,000,000 | 589,500,000 | 44,774,674.93 |
| Materials, whole job | 7,336,540,000 | 4,149,380,000 | 5,282,180,768.43 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 2.1 trades/day, 2 units/day.