Standup M-Set Basic Large Ship Manufacturing Material Efficiency II
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Artificial Neural Network | 1,000 | 900 | 1,117 | 1,016 | 1,005,300 | 914,400 | 1,050.3 |
| Conductive Thermoplastic | 200 | 180 | 6,256 | 6,047 | 1,126,080 | 1,088,460 | 8,231.7 |
| Current Pump | 1,200 | 1,080 | 144,500 | 106,100 | 156,060,000 | 114,588,000 | 113,977.99 |
| Interface Circuit | 28 | 26 | 24,490 | 21,920 | 636,740 | 569,920 | 16,386.38 |
| Lorentz Fluid | 200 | 180 | 1,957,000 | 1,801,000 | 352,260,000 | 324,180,000 | 25,876 |
| Micro Circuit | 1,200 | 1,080 | 5,357 | 5,356 | 5,785,560 | 5,784,480 | 5,230.5 |
| Nanite Compound | 20 | 18 | 2,543,000 | 2,427,000 | 45,774,000 | 43,686,000 | 131,435.16 |
| Power Circuit | 16 | 15 | 289,000 | 278,400 | 4,335,000 | 4,176,000 | 303,263.46 |
| Power Conduit | 200 | 180 | 192,200 | 179,000 | 34,596,000 | 32,220,000 | 28,267.44 |
| R.A.M.- Starship Tech | 1 | 1 | 689.9 | 640 | 689.9 | 640 | 528 |
| Trigger Unit | 1,200 | 1,080 | 498,500 | 417,100 | 538,380,000 | 450,468,000 | 43,063.99 |
| Materials, whole job | 1,139,959,369.9 | 977,675,900 | 216,192,567.93 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: — trades/day, — units/day.