Standup M-Set Equipment Manufacturing Time Efficiency II
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Artificial Neural Network | 1,200 | 1,080 | 1,117 | 1,016 | 1,206,360 | 1,097,280 | 1,050.3 |
| Conductive Thermoplastic | 250 | 225 | 6,256 | 6,047 | 1,407,600 | 1,360,575 | 8,231.7 |
| Current Pump | 1,200 | 1,080 | 144,500 | 106,100 | 156,060,000 | 114,588,000 | 113,977.99 |
| Fried Interface Circuit | 14 | 13 | 3,394 | 3,393 | 44,122 | 44,109 | 2,198.64 |
| Lorentz Fluid | 250 | 225 | 1,957,000 | 1,801,000 | 440,325,000 | 405,225,000 | 25,876 |
| Micro Circuit | 1,200 | 1,080 | 5,357 | 5,356 | 5,785,560 | 5,784,480 | 5,230.5 |
| Nanite Compound | 14 | 13 | 2,543,000 | 2,427,000 | 33,059,000 | 31,551,000 | 131,435.16 |
| Power Circuit | 8 | 8 | 289,000 | 278,400 | 2,312,000 | 2,227,200 | 303,263.46 |
| Power Conduit | 250 | 225 | 192,200 | 179,000 | 43,245,000 | 40,275,000 | 28,267.44 |
| R.A.M.- Robotics | 1 | 1 | 699.9 | 534.2 | 699.9 | 534.2 | 597.38 |
| Trigger Unit | 1,200 | 1,080 | 498,500 | 417,100 | 538,380,000 | 450,468,000 | 43,063.99 |
| Materials, whole job | 1,221,825,341.9 | 1,052,621,178.2 | 215,878,697.05 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 1.1 trades/day, 1 units/day.