Standup XL-Set Ship Manufacturing Efficiency II
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Artificial Neural Network | 125,000 | 112,500 | 1,117 | 1,016 | 125,662,500 | 114,300,000 | 1,050.3 |
| Conductive Thermoplastic | 25,000 | 22,500 | 6,256 | 6,047 | 140,760,000 | 136,057,500 | 8,231.7 |
| Current Pump | 150,000 | 135,000 | 144,500 | 106,100 | 19,507,500,000 | 14,323,500,000 | 113,977.99 |
| Interface Circuit | 3,500 | 3,150 | 24,490 | 21,920 | 77,143,500 | 69,048,000 | 16,386.38 |
| Lorentz Fluid | 25,000 | 22,500 | 1,957,000 | 1,801,000 | 44,032,500,000 | 40,522,500,000 | 25,876 |
| Micro Circuit | 150,000 | 135,000 | 5,357 | 5,356 | 723,195,000 | 723,060,000 | 5,230.5 |
| Nanite Compound | 2,500 | 2,250 | 2,543,000 | 2,427,000 | 5,721,750,000 | 5,460,750,000 | 131,435.16 |
| Power Circuit | 2,000 | 1,800 | 289,000 | 278,400 | 520,200,000 | 501,120,000 | 303,263.46 |
| Power Conduit | 25,000 | 22,500 | 192,200 | 179,000 | 4,324,500,000 | 4,027,500,000 | 28,267.44 |
| R.A.M.- Starship Tech | 1 | 1 | 689.9 | 640 | 689.9 | 640 | 528 |
| Trigger Unit | 150,000 | 135,000 | 498,500 | 417,100 | 67,297,500,000 | 56,308,500,000 | 43,063.99 |
| Materials, whole job | 142,470,711,689.9 | 122,186,336,140 | 27,024,005,519.34 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: — trades/day, — units/day.