Standup XL-Set Laboratory Optimization I
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Broken Drone Transceiver | 240,000 | 216,000 | 2,890 | 2,713 | 624,240,000 | 586,008,000 | 73.8 |
| Burned Logic Circuit | 24,000 | 21,600 | 44,560 | 44,550 | 962,496,000 | 962,280,000 | 19,367.54 |
| Charred Micro Circuit | 240,000 | 216,000 | 375.1 | 375 | 81,021,600 | 81,000,000 | 325.24 |
| Damaged Artificial Neural Network | 240,000 | 216,000 | 240.2 | 240.1 | 51,883,200 | 51,861,600 | 252.3 |
| Defective Current Pump | 240,000 | 216,000 | 12,060 | 11,220 | 2,604,960,000 | 2,423,520,000 | 415.28 |
| Fried Interface Circuit | 120,000 | 108,000 | 3,394 | 3,393 | 366,552,000 | 366,444,000 | 2,198.64 |
| Melted Capacitor Console | 120,000 | 108,000 | 3,041 | 3,040 | 328,428,000 | 328,320,000 | 4,796.96 |
| Scorched Telemetry Processor | 240,000 | 216,000 | 2,001 | 2,000 | 432,216,000 | 432,000,000 | 61.59 |
| Smashed Trigger Unit | 240,000 | 216,000 | 4,611 | 4,610 | 995,976,000 | 995,760,000 | 73.06 |
| Thruster Console | 240,000 | 216,000 | 8,366 | 7,615 | 1,807,056,000 | 1,644,840,000 | 45.02 |
| Materials, whole job | 8,254,828,800 | 7,872,033,600 | 1,603,401,046.57 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 1.1 trades/day, 1 units/day.