Standup M-Set Energy Neutralizer Projection II
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Artificial Neural Network | 750 | 675 | 1,117 | 1,016 | 753,975 | 685,800 | 1,050.3 |
| Conductive Thermoplastic | 100 | 90 | 6,256 | 6,047 | 563,040 | 544,230 | 8,231.7 |
| Drone Transceiver | 750 | 675 | 55,000 | 53,000 | 37,125,000 | 35,775,000 | 21,974.08 |
| Enhanced Ward Console | 4 | 4 | 980,000 | 922,700 | 3,920,000 | 3,690,800 | 1,052,137.06 |
| Impetus Console | 100 | 90 | 89,740 | 73,630 | 8,076,600 | 6,626,700 | 8,162.59 |
| Intact Shield Emitter | 4 | 4 | 375,300 | 375,200 | 1,501,200 | 1,500,800 | 341,920.51 |
| Lorentz Fluid | 100 | 90 | 1,957,000 | 1,801,000 | 176,130,000 | 162,090,000 | 25,876 |
| Power Conduit | 100 | 90 | 192,200 | 179,000 | 17,298,000 | 16,110,000 | 28,267.44 |
| R.A.M.- Energy Tech | 1 | 1 | 668 | 550.9 | 668 | 550.9 | 686.65 |
| Single-crystal Superalloy I-beam | 4 | 4 | 61,120 | 61,100 | 244,480 | 244,400 | 76,995.21 |
| Telemetry Processor | 750 | 675 | 154,500 | 145,000 | 104,287,500 | 97,875,000 | 20,303.43 |
| Materials, whole job | 349,900,463 | 325,143,280.9 | 45,434,530.58 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 1.1 trades/day, 1 units/day.