Standup M-Set Electronic Warfare Projection I
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Alloyed Tritanium Bar | 130 | 117 | 2,088 | 2,087 | 244,296 | 244,179 | 1,931.02 |
| Broken Drone Transceiver | 600 | 540 | 2,890 | 2,713 | 1,560,600 | 1,465,020 | 73.8 |
| Conductive Polymer | 600 | 540 | 24,060 | 24,050 | 12,992,400 | 12,987,000 | 402.03 |
| Contaminated Lorentz Fluid | 600 | 540 | 62,510 | 62,500 | 33,755,400 | 33,750,000 | 383.8 |
| Damaged Artificial Neural Network | 600 | 540 | 240.2 | 240.1 | 129,708 | 129,654 | 252.3 |
| Malfunctioning Shield Emitter | 600 | 540 | 244.3 | 244.2 | 131,922 | 131,868 | 395.08 |
| Scorched Telemetry Processor | 600 | 540 | 2,001 | 2,000 | 1,080,540 | 1,080,000 | 61.59 |
| Tangled Power Conduit | 600 | 540 | 82,550 | 76,330 | 44,577,000 | 41,218,200 | 431.02 |
| Thruster Console | 600 | 540 | 8,366 | 7,615 | 4,517,640 | 4,112,100 | 45.02 |
| Ward Console | 400 | 360 | 11,190 | 11,180 | 4,028,400 | 4,024,800 | 12,677.28 |
| Materials, whole job | 103,017,906 | 99,142,821 | 6,548,728.75 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 1.4 trades/day, 2 units/day.