Standup L-Set Energy Neutralizer Feedback Control I
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Alloyed Tritanium Bar | 1,625 | 1,463 | 2,088 | 2,087 | 3,054,744 | 3,053,281 | 1,931.02 |
| Broken Drone Transceiver | 7,500 | 6,750 | 2,890 | 2,713 | 19,507,500 | 18,312,750 | 73.8 |
| Conductive Polymer | 7,500 | 6,750 | 24,060 | 24,050 | 162,405,000 | 162,337,500 | 402.03 |
| Contaminated Lorentz Fluid | 7,500 | 6,750 | 62,510 | 62,500 | 421,942,500 | 421,875,000 | 383.8 |
| Damaged Artificial Neural Network | 7,500 | 6,750 | 240.2 | 240.1 | 1,621,350 | 1,620,675 | 252.3 |
| Malfunctioning Shield Emitter | 7,500 | 6,750 | 244.3 | 244.2 | 1,649,025 | 1,648,350 | 395.08 |
| Scorched Telemetry Processor | 7,500 | 6,750 | 2,001 | 2,000 | 13,506,750 | 13,500,000 | 61.59 |
| Tangled Power Conduit | 7,500 | 6,750 | 82,550 | 76,330 | 557,212,500 | 515,227,500 | 431.02 |
| Thruster Console | 7,500 | 6,750 | 8,366 | 7,615 | 56,470,500 | 51,401,250 | 45.02 |
| Ward Console | 5,000 | 4,500 | 11,190 | 11,180 | 50,355,000 | 50,310,000 | 12,677.28 |
| Materials, whole job | 1,287,724,869 | 1,239,286,306 | 81,859,109.41 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 1.7 trades/day, 2 units/day.