EveBoosters

LINKING…

Hexa 2500mm Repeating Cannon II

Market detail
Blueprint #41166Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 5.34B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job168,433,789.7
Install fee27,389,075.86
Total cost, whole job195,822,865.56
Cost per unit195,822,865.56
Profit / unit
-5,767,115.56
Margin
-2.9%
Profit, whole job (1 unit)-5,767,115.56
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job131,319,372.4
Install fee27,389,075.86
Total cost, whole job158,708,448.26
Cost per unit158,708,448.26
Profit / unit
31,347,301.74
Margin
19.8%
Profit, whole job (1 unit)31,347,301.74
Job install fee
Estimated Item Value (EIV)127,509,664.14
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 127,509,664.14 × 21.48%
Install fee, whole job27,389,075.86

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit197,000,000
Jita buy price, per unit175,400,000
Sales tax (2.02%)-3,989,250
Broker fee (1.50%)-2,955,000
Net revenue, per unit190,055,750
Net revenue, whole job (1 unit)190,055,750

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Hexa 2500mm Repeating Cannon I1166,590,00038,500,00066,590,00038,500,00045,471,659.84
Morphite1,5701,41320,10018,83028,401,30026,606,79019,610.43
R.A.M.- Weapon Tech33809.9690.82,429.72,072.4480.11
Robotics36933387,00083,57028,971,00027,828,81035,803.74
Thermonuclear Trigger Unit2,4862,23819,87017,15044,469,06038,381,70015,300.33
Materials, whole job168,433,789.7131,319,372.4127,509,664.14

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 14.7 trades/day, 29 units/day.