EveBoosters

LINKING…

Dragonfly II

Market detail
Blueprint #41378Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 1.38B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job10,534,440
Install fee1,408,033.13
Total cost, whole job11,942,473.13
Cost per unit11,942,473.13
Profit / unit
3,406,699.37
Margin
28.5%
Profit, whole job (1 unit)3,406,699.37
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job8,717,320
Install fee1,408,033.13
Total cost, whole job10,125,353.13
Cost per unit10,125,353.13
Profit / unit
5,223,819.37
Margin
51.6%
Profit, whole job (1 unit)5,223,819.37
Job install fee
Estimated Item Value (EIV)6,555,089.04
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 6,555,089.04 × 21.48%
Install fee, whole job1,408,033.13

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit15,910,000
Jita buy price, per unit12,900,000
Sales tax (2.02%)-322,177.5
Broker fee (1.50%)-238,650
Net revenue, per unit15,349,172.5
Net revenue, whole job (1 unit)15,349,172.5

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Dragonfly I116,474,0005,209,0006,474,0005,209,0004,968,742.24
Gravimetric Sensor Cluster121120,41018,200224,510200,20018,551.56
Graviton Reactor Unit1615148,700124,4002,230,5001,866,00027,501.74
Guidance Systems121175,95072,550835,450798,05018,669.07
Magpulse Thruster121129,53023,060324,830253,66015,535.33
Morphite121120,11018,860221,210207,46019,610.43
R.A.M.- Starship Tech336906302,0701,890528
Superconductor Rails121120,17016,460221,870181,06023,028.19
Materials, whole job10,534,4408,717,3206,555,089.04

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 9.3 trades/day, 101 units/day.