EveBoosters

LINKING…

'Excavator' Mining Drone

Market detail
Blueprint #43915Build system Jita 0.9 · The ForgeIndex 17.21%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 3.93B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job209,003,451.6
Install fee9,155,570.17
Total cost, whole job218,159,021.77
Cost per unit218,159,021.77
Profit / unit
-24,147,796.77
Margin
-11.1%
Profit, whole job (1 unit)-24,147,796.77
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job191,233,603.8
Install fee9,155,570.17
Total cost, whole job200,389,173.97
Cost per unit200,389,173.97
Profit / unit
-6,377,948.97
Margin
-3.2%
Profit, whole job (1 unit)-6,377,948.97
Job install fee
Estimated Item Value (EIV)42,663,421.1
fee = EIV × ( index 17.21% + facility 0.25% + SCC 4% )
= 42,663,421.1 × 21.46%
Install fee, whole job9,155,570.17

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit201,100,000
Jita buy price, per unit190,000,000
Sales tax (2.02%)-4,072,275
Broker fee (1.50%)-3,016,500
Net revenue, per unit194,011,225
Net revenue, whole job (1 unit)194,011,225

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Crystalline Carbonide Armor Plate5004506,4365,9422,896,2002,673,9005,674.42
Drone Capillary Fluid3503159,6909,3003,052,3502,929,500983.9
Drone Cerebral Fragment125113286,600260,70032,385,80029,459,1001,865.57
Drone Coronary Unit756829,01029,0001,972,6801,972,0002,183.73
Drone Epidermal Shielding Chunk1501352,7002,699364,500364,365384.32
Drone Synaptic Relay Wiring6005402,0012,0001,080,5401,080,0001,750.05
Drone Tactical Limb1251138,8018,800994,513994,400606.11
Elite Drone AI50452,796,0002,600,000125,820,000117,000,000901.71
Fusion Reactor Unit1514142,800132,3001,999,2001,852,20028,365.62
Ion Thruster201839,99035,900719,820646,20020,690.81
Magnetometric Sensor Cluster454119,19016,380786,790671,58013,945.22
Mining Laser Upgrade II109601,700378,6005,415,3003,407,400756,397.68
Modulated Strip Miner II115,740,0005,131,0005,740,0005,131,0005,349,991.36
Morphite20018020,11018,9003,619,8003,402,00019,610.43
Oscillator Capacitor Unit12010834,83032,6303,761,6403,524,04034,114.6
Photon Microprocessor50045035,96033,10016,182,00014,895,00028,922.41
Pulse Shield Emitter454153,72029,8402,202,5201,223,44021,989.67
R.A.M.- Robotics1514699.9534.29,798.67,478.8597.38
Materials, whole job209,003,451.6191,233,603.842,663,421.1

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.21%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 7.3 trades/day, 20 units/day.