EveBoosters

LINKING…

True Sansha Dual Giga Pulse Laser

Market detail
Blueprint #41113Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d /day
Illiquid. True Sansha Dual Giga Pulse Laser no trade history yet; no daily volume yet. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job248,093,148.6
Install fee50,241,066.26
Total cost, whole job298,334,214.86
Cost per unit298,334,214.86
Profit / unit
121,428,510.14
Margin
40.7%
Profit, whole job (1 unit)121,428,510.14
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job221,009,523.31
Install fee50,241,066.26
Total cost, whole job271,250,589.57
Cost per unit271,250,589.57
Profit / unit
148,512,135.43
Margin
54.8%
Profit, whole job (1 unit)148,512,135.43
Job install fee
Estimated Item Value (EIV)233,896,956.51
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 233,896,956.51 × 21.48%
Install fee, whole job50,241,066.26

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit435,100,000
Jita buy price, per unit75,200,000
Sales tax (2.02%)-8,810,775
Broker fee (1.50%)-6,526,500
Net revenue, per unit419,762,725
Net revenue, whole job (1 unit)419,762,725

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Compact Compounds3128147,000138,0004,116,0003,864,000127,644.03
Compact Conductors474323,00019,000989,000817,00023,200.38
Compact Electronics312810,1905,600285,320156,8009,962.2
Dual Giga Pulse Laser II11241,800,000215,900,000241,800,000215,900,000225,586,471.78
Enduring Compounds27253,3801,10084,50027,5001,162.92
Enduring Conductors353211,2903,700361,280118,4003,478.72
Enduring Electronics25237,8172,054179,79147,2425,333.88
Precise Compounds302718050.184,8601,354.86185
Precise Conductors4339564.7175.922,023.36,860.158,430.02
Precise Electronics2927899.981.0524,297.32,188.35141.3
Scoped Compounds30271,49990040,47324,3002,642.91
Scoped Conductors40363,994800143,78428,8001,283.07
Scoped Electronics33301,394502.641,82015,078455.27
Materials, whole job248,093,148.6221,009,523.31233,896,956.51

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: trades/day, units/day.