EveBoosters

LINKING…

True Sansha Dual Giga Beam Laser

Market detail
Blueprint #41125Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d /day
Illiquid. True Sansha Dual Giga Beam Laser no trade history yet; no daily volume yet. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job247,244,082.2
Install fee46,055,027.93
Total cost, whole job293,299,110.13
Cost per unit293,299,110.13
Profit / unit
93,758,589.87
Margin
32.0%
Profit, whole job (1 unit)93,758,589.87
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job229,763,300.05
Install fee46,055,027.93
Total cost, whole job275,818,327.98
Cost per unit275,818,327.98
Profit / unit
111,239,372.02
Margin
40.3%
Profit, whole job (1 unit)111,239,372.02
Job install fee
Estimated Item Value (EIV)214,408,882.34
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 214,408,882.34 × 21.48%
Install fee, whole job46,055,027.93

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit401,200,000
Jita buy price, per unit212,000,000
Sales tax (2.02%)-8,124,300
Broker fee (1.50%)-6,018,000
Net revenue, per unit387,057,700
Net revenue, whole job (1 unit)387,057,700

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Compact Compounds3027147,000138,0003,969,0003,726,000127,644.03
Compact Conductors333023,00019,000690,000570,00023,200.38
Compact Electronics363310,1905,600336,270184,8009,962.2
Dual Giga Beam Laser II11241,300,000225,000,000241,300,000225,000,000205,602,329.83
Enduring Compounds34313,3801,100104,78034,1001,162.92
Enduring Conductors333011,2903,700338,700111,0003,478.72
Enduring Electronics28267,8172,054203,24253,4045,333.88
Precise Compounds161518050.182,700752.7185
Precise Conductors5853564.7175.929,929.19,322.758,430.02
Precise Electronics3229899.981.0526,097.12,350.45141.3
Scoped Compounds31281,49990041,97225,2002,642.91
Scoped Conductors45413,994800163,75432,8001,283.07
Scoped Electronics29271,394502.637,63813,570.2455.27
Materials, whole job247,244,082.2229,763,300.05214,408,882.34

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: trades/day, units/day.